Uncategorized Banner Refurbishment Turf Moor October 24, 2018 Ceri Banner Refurbishment Turf Moor A day’s work to repair some wind damaged banners in the David Fishwick stand at Burnley FC’s ground.
Uncategorized Cladding Inspection Manchester October 17, 2018 Ceri Inspection of some potentially wind damaged cladding on a high rise residential block in Manchester
Uncategorized Large Format Banner Install Manchester May 14, 2018 Ceri Large format banner (30m x 15m) installed to the Kampus development in city centre Manchester
Uncategorized Warehouse Crane Refurbishment Project April 30, 2018 Ceri 3 month project to refurbish a large number of warehouse cranes in Pontefract. Temporary staging platforms were built to help with access.
Uncategorized Gasket installation to highrise building March 23, 2018 Ceri Installation of a gasket to a unitized glazing system 44 floors up in Manchester
Uncategorized Eyebolt installation Manchester March 14, 2018 Ceri Installation of ~50 resin fixed anchor bolts for a large format banner in Manchester
Uncategorized Cladding Cleaning Exchange Court Manchester December 17, 2017 Ceri Removal of concrete dust and slurry from cladding panels
Uncategorized Signage replacement Velopark Manchester October 16, 2017 Ceri Installation of new branding panels to the bridge at Velopark Manchester
Uncategorized Concrete Testing Manchester September 14, 2017 Ceri Testing the integrity of the concrete on a building in Manchester
Uncategorized Installing new LED illumination June 27, 2017 Ceri Installing new LED illumination into signage in Salford by abseil